Skip To Main Content

6920 - Construction Design

  • Policy

Facilities will be designed to accommodate the educational and instructional needs of the district. The professional experience and judgment of staff will be used in developing such educational specifications. The law requires that special attention be given the accessibility to the education program by students of both sexes and those with disabilities. The superintendent will see that all construction projects comply with the requirements for accessibility to individuals with disabilities and comparability between the sexes.

After determining that a need for new or improved facilities exists, the board, with the guidance of its professional staff, will engage in the following processes:

  1. Engage construction management services;
  2. Select an architect;
  3. Review a site evaluation including an assessment of existing facilities, if any, on the site;
  4. Develop educational specifications recognizing instructional needs and available financial resources;
  5. Review and approve schematic design prepared by the architect, assuring that the new or remodeled facility or part of a facility is readily accessible to and usable by individuals with disabilities;
  6. Review a value engineering study and constructability review, and approve construction design including construction estimates;
  7. Call for bids; and
  8. Review and approve final construction contract;

The board will comply with the terms and conditions as specified in the contract between the architect and the school district.

 

Legal References:

Chapter 39.35 RCW

Energy conservation in design of public facilities

42 U.S.C. § 12101 et. seq.

Americans with Disabilities Act

WAC  392-343-080

Value engineering studies, constructability reviews, and building                       commissioning — Requirements and definitions

WAC  392-343-102

Construction management

WAC  392-344-065

Value engineering contracts

WAC  392-344-066

Constructability review contracts

WAC  392-344-075

Contracts — Filing

 

Management Resources:

2011 – October Issue

 

Adoption Date:  December 19, 2005

Revision (LR):  June 27, 2007, July 24, 2024

 

Administrator Responsibilities:

  • 6000 Series
Policies & Procedures
Series 2000 - Instruction
Series 3000 - Student
Series 4000 - Community Relations
Series 5000 - Personnel Services
Series 6000 - Management Support

 

Looking for a Procedure?

Procedures are currently listed on each series page. Please find the policy that you are looking for and take note of the "Series" category associated with it. Click on the Series links above to access the appropriate page.