Skip To Main Content

Explorer and Discovery Replacement (Shared Campus)

Replacement Concept for Explorer Academy and Discovery High School:

  • Build combined campus on current Discovery High School site. Two separate schools with shared connecting space.
  • 34,900 square foot school with 400 student capacity
  • Eliminate 6 portable classrooms
  • Include collaboration and cafeteria spaces
  • $26 million bond ask
  • Eligible for $3.8 million in state construction assistance funding 

 

Explorer Discovery bond concept

Draft artist concept for school layout.

Replacement Concept for Explorer Academy and Discovery High School:

  • Build combined campus at Madrona Heights site. Two separate schools with shared connecting space.
  • 34,900 square foot school with 400 student capacity
  • Eliminate 6 portable classrooms
  • Include collaboration and cafeteria spaces
  • $26 million bond ask total including Explorer
  • Eligible for $3.8 million in state construction assistance funding 

 

Explorer Discovery bond concept